Harvard University Planning and Design develops reports to support University activities.
Institutional Master Plans
As required by the City of Boston Zoning Code, Harvard’s campuses in Boston maintain Institutional Master Plans (IMPs) that describe existing facilities, long-range planning goals, and upcoming projects that exceed minimum thresholds. IMPs are updated and renewed periodically and may be amended as new projects are proposed.
- Allston IMP: Harvard Allston IMP 2013-2023
- Longwood IMP: Harvard Longwood IMP February 2003
- Longwood IMP_2018-2023 Renewal: Harvard Longwood IMP Renewal IMPNF 6-20-2018
- Arboretum IMP: Harvard Arboretum IMP 8-03-2007
- Arboretum IMP_2021-2031 Renewal: Harvard Arboretum IMP Renewal Submission 5-19-2021
Town Gown Report
Annual report to the City of Cambridge regarding Harvard’s Cambridge campus. Includes population, buildings, and land statistics, the status of current and planned construction projects, and information on the University’s sustainability efforts.
Parking and Transportation Demand Management
Report on the University’s Parking and Transportation Demand Management (PTDM) strategies and measures to reduce traffic congestion and to encourage use of alternative modes of transportation. Harvard’s PTDM Plan was approved in 2003 by the City of Cambridge, and is supplemented by annual progress reports documenting ongoing PTDM efforts.
- Commuter choice Cambridge Campus 2022 Year in Review
- 2003 Parking and Transportation Demand Management Plan